30m Spider Boom Lift for Shanxi Wanda Plaza
The self-developed 30m spider boom lift manufactured by Hubei Goman Heavy Industry has been officially delivered and put into service at Shanxi Wanda Plaza. As a landmark large-scale commercial complex in the region, Shanxi Wanda Plaza imposes extremely high standards for passability, safety and working efficiency of aerial work equipment.

The successful application of the 30m high-reach spider lift thoroughly solves the core industry pain points of traditional aerial equipment, which struggles to access and deploy in complex indoor environments. With superior comprehensive performance, it has become an essential high-efficiency tool for daily facility maintenance of large shopping malls.
Site Pain Points: Restricted Aerial Work Zones in Commercial Complexes
Large commercial plazas such as Wanda Plaza present highly specialized and harsh requirements for high-altitude maintenance:
Fragile Premium Floor Materials
Atriums and connecting corridors are paved with high-end marble and luxury floor tiles. Traditional wheeled aerial equipment requires full protective board laying before entry, which is time-consuming and labor-intensive. Meanwhile, hard tires easily scratch or damage delicate finished floors, causing property losses.
Severe Spatial Constraints
Although the central atrium features a super-high vertical space, the surrounding floor corridors and escalator side areas are extremely narrow. Large straight boom lifts cannot unfold or operate normally, leaving many high-altitude dead zones inaccessible to conventional equipment.
High-Pedestrian & Business Continuity Requirements
The mall maintains normal business operation throughout maintenance periods. All equipment must feature low noise and zero-emission performance to avoid disturbing the shopping environment. Additionally, operation is prohibited on main pedestrian passages to ensure smooth customer flow.
Traditional scaffolding involves long construction cycles and serious business disruption, while ordinary aerial lifts fail to adapt to complex indoor working conditions. Equipped with a unique multi-leg bionic chassis design, Goman’s 30m spider lift serves as the optimal solution for high-standard mall maintenance scenarios.
Core Technical Strengths: Perfect Integration of 30m Ultra-High Reach & Full-Terrain Adaptability
The 30m spider boom lift is Goman’s flagship model customized for high-altitude and narrow-space commercial maintenance scenarios, delivering outstanding targeted advantages in actual operation:
30m Max Working Height for Full-Scenario Coverage
With a maximum working height of 30 meters, the equipment fully covers 4–6 story super-high atriums, exterior curtain walls and top-floor mechanical layers of mainstream commercial complexes. It completes various high-level tasks in one stop, including giant banner replacement, glass dome maintenance and LED screen installation, eliminating repeated site transfers and greatly improving overall progress.
0.8m Ultra-Narrow Chassis for Barrier-Free Access
The retracted chassis width is only 0.8 meters, enabling free passage through passenger elevators, cargo elevators and narrow service aisles. Adopting damage-free rubber crawler traveling mechanism, the lift stably climbs escalator steps and sloped floors without scratching or crushing premium ground materials, realizing completely traceless indoor operation.
360° Full-Range Rotation for Precise Obstacle Avoidance
Facing densely distributed columns, advertising billboards and lighting systems inside the mall, the upper turret supports 360° continuous rotation with wide-angle basket swinging. Operators can accurately avoid all obstacles and deliver personnel and tools to precise working points without chassis movement, boosting operational efficiency by more than 50% compared with traditional equipment.
Practical Value: Win-Win of Safety, Efficiency & Economic Benefits
Since deployment, the 30m spider lift has successfully completed multiple high-difficulty maintenance tasks at Shanxi Wanda Plaza, including exterior glass cleaning, atrium lighting renovation and fire pipeline inspection.
Zero-Safety-Accident Operation
Equipped with an intelligent anti-tilt system, emergency manual lowering device and dual insulation protection for live-working scenarios, the equipment builds a solid safety barrier for high-foot-traffic commercial environments.
Greatly Shortened Construction Period
Curtain wall maintenance work that previously required 3 days of scaffolding erection can now be finished in just 4 hours. The on-demand deployment feature minimizes occupation of public areas and effectively avoids disruption to mall daily operation.
Reduced Comprehensive Operating Costs
Compared with large crane rental and full scaffolding construction, the spider lift cuts comprehensive maintenance costs by 30%–40%. It supports independent single-person operation with no need for auxiliary workers, realizing lean and efficient facility management.
Project Significance: Setting a New Benchmark for Commercial Facility Operation & Maintenance
The project person in charge of Shanxi Wanda Plaza commented:
“Goman’s 30m spider lift completely solves our long-standing high-altitude maintenance difficulties and upgrades the overall intelligent level of property operation. Its ultra-flexible mobility and superior high-reach performance are highly rare among similar equipment in the current market.”
The successful delivery of the Shanxi Wanda project marks another major breakthrough for Hubei Goman Heavy Industry in the commercial real estate segment. Moving forward, Goman will continue to focus on the R&D and iteration of high-height, compact and intelligent aerial work equipment, providing professional, reliable and cost-effective high-altitude operation solutions for urban landmarks and commercial centers nationwide.
7